Building Concepts has extensive expertise in foundation repairs and underpinning. As a certified Chance & Pier Tech Systems Helical Pier installer, Building Concepts will work with you & your engineers to develop the most cost-efficient solution for your project. We can provide preliminary engineering and feasibility analysis to determine if helical piles are a good option for your project based on your soils information and loading requirements. Building Concepts can also provide foundation inspection and retrofit to alleviate and/or repair existing foundation settlement issues. We can also provide engineered foundation repair for various types of footings, foundation walls and basements.
Helical piles have been around since the early 1800's and have been utilized extensively all over the world. The helical pile system is a segmented deep foundation system with helical bearing plates welded to a central circular or square shaft. Load is transferred from the shaft to the soil through helical bearing plates. As a result of their true helical shape, the helices do not auger into the soil, but instead screw into it with minimal disturbance. Unlike concrete foundations, which require a multistep process of excavation, forming, placing rebar, pouring and curing concrete; helical piles are installed in one step. Helical piers do not create soil spoils and potential erosion.
• Fast turnkey installation
• Immediate loading
• Equipment portability
• Pre-engineered system
• Easily field modified
• On site load test on each pier
• Two stage installation for load capacity checks
• All-weather installation
• Solution for:
- Restricted access sites
- High water table
- Weak surface soils
• Environmentally friendly
• No vibration
• No spoils to remove
Building Concepts recently completed helical pile installations in 2025 for the Leckie Education Campus Addition located in Washington, D.C. This project included over 250 helical pile installations. Building Concepts provided strategic planning to install the piles in a timely and safe manner on a tight schedule & in a confined construction site.
We installed over a mile of helical piles in less than 4 weeks!
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.